

Case Studies

Başhan Bulgur Biogas
1 x 250 kWe agenitor 406
An agenitor 406 uses the biogas produced by the Başhan Bulgur Factory's anaerobic wastewater treatment facility constructed to treat the starch rich process wastewater after the bulgur production.
reference of PALES

Three Rivers Solid Waste Landfill
1 x 1200 kWe avus 1000c
An avus 1000c uses the gas produced by the Three Rivers Solid Waste Landfill and thus supplies almost 1,000 households with electricity and heat.
reference of 2G

The Athlon Sports Center Cogeneration
1 x 20 kWe g-box 20
reference of 2G

Merck Factory Trigeneration
2 x 1560 kWe avus 1500c
The construction of a new tri-generation energy centre on the premises of Merck’s main plant in Darmstadt, where 8,900 people work, will supply the pharmaceutical production and parts of the research division with selfproduced electricity, heat and chilled water. Two avus 1500c combined heat and power plants were installed in the energy center, each producing 1,560 kW of electrical power and 1,586 kW of thermal energy for heating and cooling requirements. Power, heat and cooling cogenerated in the CHP will save approx. 2,500 tons of CO2 from being produced each year.
reference of 2G